Instigated by Mr. Chen Mouse from Hubei, I reluctantly sold my short Y60 at a loss. I bought a new 2700 with a 3RZ head, refurbished the whole car and prepared to go to Tibet. The mouse said that the short board is not suitable for long-distance running and my Y60 It was changed to a diesel 4JB1 machine. He frightened me by saying that the plateau would be slower than the micro-face, and it happened that this LC90 was sold and the Toule started to toss!
[ This post was last edited by Cao Shangfei at 2012-6-3 09:49 ] |
-
The whole car is disassembled and thoroughly cleaned and derusted
-
The engine was thoroughly cleaned and cleaned with engine cleaning agent for more than 3 hours, it looked brand new
-
Chassis armor, spray anti-corrosion
-
cabin color change
-
Large shelf rust removal spray paint
Decided to change the color, I still like white, firstly the interior of the cabin and the wheel eyebrows are painted first
[ This post was last edited by Cao Shangfei at 2012-6-3 07:31 ] |
-
The bayonet of the wheel eyebrows is banned and replaced with bolts. It is inconvenient to disassemble, but it is firm.
-
Check the gaps and front and rear lines of the whole car fender installation
-
The master is meticulous in his work, but he is going to go on strike after being tortured by the bed these days, hehe
-
The whole car parts in the basement
-
The cover of the inner button of the left rear door is incomplete. You can’t buy a new one. You can DIY it by yourself. Hehe, it may not be visible after polishing and spraying paint.
-
Wader Positioning
-
Front bumper check
-
The door is dismantled and the door is treated to make it flawless
-
wader punching
-
The progress has been slow in the past few days, and I dare not rush. The foundation must be taken care of, and I will strive to surpass the original paint surface.
-
Alloy putty for the whole car, although the cost is high, there will be no cracks
-
The workers polish it meticulously, wait patiently by the side and dare not urge, slow work produces meticulous work!
-
Due to the replacement of the big foot 315-70-17 tire hub, the door is opened and the tail light is scraped, and the spare tire bracket is moved to the left to add a backing plate
-
DIY putty on the inner buckle cover of the left rear door
-
The door is sprayed in advance to prevent the overall spray paint from being in place
-
Refurbishment of the whole car interior to dark gray
-
Spray imported plastic primer
-
Change the middle control panel to metallic color
-
ready to paint
-
The overall paint is sprayed three times, using imported varnish
-
The overall effect is very good, the paint surface is very thick, and the hardness is also very good. Tomorrow, the car will be loaded and polished, and then the whole car will be soundproofed
Finish the painting, start the accessories and glass installation, then do sound insulation for the whole car, polish the paint surface, replace the big wheel hub tire 315-70-17 Cooper ATR, the hub is selected by Lao Jin in “Golden Wheel World”, it is very beautiful The progress of the project has been slow in the past few days. The first shaft of the gearbox has a tooth, and the second and third gear synchronizers are severely worn. With the help of “Xuanhua” in Guiyang, Guizhou, I replaced the dismantled gearbox. “Xuanhua” expressed his thanks!
[ This post was last edited by Cao Shangfei at 2012-12-26 11:26 ] |
-
Engine accessories cleaning and installation
-
Bench installation
-
Change the middle control panel to metallic color
-
Full car glass installation
-
Install sound insulation cotton on the roof, sound insulation and heat insulation
-
Aluminum foil sound insulation glue for the floor
-
Lay the original car carpet on the soundproof glue
-
Door sheet metal paste aluminum foil sound insulation glue
-
Foaming agent is used to fill the foam sponge in the original car, which is dust-proof and anti-corrosion
-
The original car carpet is not clean, and the floor glue is installed
-
Install sound insulation cotton in the door panel
-
Tengyue seat cover, the fabric is really good
-
Multifunctional off-road sun visor
-
Special glue for sound insulation and heat insulation on the engine cover
-
Full car polishing
-
The rear part is completed, and the taillights are all replaced with brand new original factory
-
Fully assembled accessories, circuit lighting installation
-
Install the pedals, Nissan Qashqai, huh, I like this pedal
-
replace bigfoot
-
Prado car stickers, like this car stickers
-
E family car stickers, made by our Heilongjiang brigade
-
Also, the front bumper IPF license plate holder will be installed tomorrow, and we will try to complete it within two days
-
After changing the big feet, turn and scrape the wheel eyebrows, cut the wheel eyebrows, and move the fenders backward
-
welding after cutting
-
Fabrication and installation of engine dustproof sealant
-
IPF license plate lamp holder and front fog lamp installation
-
Front fender installation
-
I really like this sticker
-
Buy speaker fabric, decorate it, huh
-
The overall effect is good, the fabric is 200 yuan and there is still leftovers
-
Radio Antenna Installation
-
Host installation location
-
Control panel and audio installation location
-
overall effect
-
The installation is complete, hehe
-
The original electroplated shield of the front fog lamp is not good-looking, so it has been refitted